Cisco 3945 Slot Numbering

Posted on by admin

Enabling Enterprise Networks at the Branch

The Cisco 3945 Integrated Services Router (ISR) delivers highly secure data, voice, video, and application services to the small office. Key features include:

Manufacturer Cisco Systems, Inc Manufacturer Part Number C3900-SPE250/K9 Product Type Control processor Supported Platforms Cisco 3945E ISR Networking Form Factor Plug-in module Connectivity Technology Wired Features Hardware encryption Connectivity Slots Expansion Slots Total (Free) 2 ( 2 ) x CompactFlash Card 3 ( 3 ) x EHWIC 2 ( 2 ) x SFP (mini-GBIC). We have leveraged our industry experience to work out some cool and exclusive no deposit Cisco 3945 Slot Numbering bonuses from some of the best casinos around for US players. The bonus codes on our site are unique, which means you can use them only if you get to the casino through our website. Cisco WAN:: 3945 - Configuring Routing With Switch Module SM-ES3-24P Oct 11, 2011. We have Cisco 3945 Router with SM-ES3-24P Switch Module. When we tried to configure routing in Router and Layer 3 ports on Switch module, the inter-communicaiton is not working?

  • Modular Services Performance Engine (SPE) 150, which can be upgraded for even higher performance as next-generation WAN environments evolve
  • 3 integrated 10/100/1000 Ethernet ports with 2 ports capable of RJ-45 or SFP connectivity
  • 4 service module slots
  • 4 Enhanced High-Speed WAN Interface Card slots
  • 4 onboard digital signal processor (DSP) slots
  • 1 Internal Services Module slot
  • Dual integrated power supplies
  • Fully integrated power distribution to modules supporting 802.3af Power over Ethernet
  • Security
    • Embedded hardware-accelerated VPN encryption for secure connectivity
    • Integrated threat control using Cisco IOS Firewall, Cisco IOS Zone-Based Firewall, Cisco IOS IPS, and Cisco IOS Content Filtering
    • Identity management using authentication, authorization, and accounting (AAA) and public key infrastructure
  • Unified Communications
    • High-density-packet voice DSP module, optimized for voice and video support
    • Standards-certified VoiceXML browser services
    • Cisco Unified Border Element capabilities for up to 1000 sessions
    • Cisco Unity Express voicemail support
    • Support for Cisco Communications Manager Express and Survivable Remote Site Telephony


Similar Messages:
ADVERTISEMENTCisco 3945 Slot Numbering

Cisco WAN :: 3945 Ethernet Switch Module

Aug 8, 2012

I have a Ethernet module (SM-ES3G-16-P) installed in a 3945 router and noticed during first boot no licenses are active at all. I would assume at a mimimum ipbase would be active. With this module, does static routing work with just ipbase?
Example:
interface g0/1
no switchport
ip addr 192.168.254.2 255.255.255.0
[code]....

Cisco WAN :: 3945 Ether Switch L3 Module License

Jan 5, 2013

I have one 3945 router with SM-ES3-16-P module with SL-ES3-16-IPS. I am not seeing any license for this module in CLI output of my router. How do I add license for this module and activate. do I need IP Service IOS for this module

Cisco Switching/Routing :: Configuring 1941 With 8 Port EHWic Switch Module And Onboard GE Ports In Single LAN?

Jul 1, 2012

Can you configure a Cisco 1941 to use an 8 port EHWic module and the 2 onboard GE ports in a single LAN?
I've discovered you can't have the on GE ports associated with a VLan, and I'm when I've previously researched for a solution, bridging was mentioned but I cannot seem to get it to work (or completely understand it)The reason I would like to use all 10 ports on for the LAN is becuase I have 10 devices I need to connect to the 1941?

Cisco WAN :: 3945 With SM-ES3G-24-P Module - Routing Configuration

Apr 30, 2012

I've a 3945 with SM-ES3G-24-P module installed and tried to configure some routing but it doesn't work .
1. L3 interface on the switch modules (with ip address configured)
2. OPSF on the router with connected interface redistribute (which includes the switch module L3 interfaces)
I don't see any of the switch module L3 interfaces routes in the router, not even the connected interface.
SM
-----
int g0/1
no switchport
ip add 1.1.1.1 255.255.255.0
Router
---------
int g0/0
ip add 2.2.2.2 255.255.255.0
router ospf 1
redistribute connected
network 2.2.2.2 0.0.0.0 area 0

Cisco Switching/Routing :: Configuring EtherSwitch Module On A C2911 ISR G2?

Jun 12, 2013

We just received a new C2911 G2 ISR and have been trying to configure the EtherSwitch SM-ES2-24-P module on it. Through the router console, I tried assigning an IP address to the router Gi1/1 interface which I assume is the link to the Etherswitch module but all I'm getting is 'IP addresses may not be configured on L2 links' - as per the docs, I should be able to assign an IP address on that 'logical' interface link. Any other way for me to configure the ports on that switch module?

Cisco WAN :: HSRP On 3945 ISR With WLC Module

Mar 7, 2012

We want to implement HSRP between two 3945 ISRs:
RouterModelIOSModuleR1Cisco 3945 Integrated Service
Routerc3900-universalk9-mz.SPA.151-1.T.binNME-AIR-WLC12-K9
R2Cisco 3945 Integrated Service
Routerc3900-universalk9-mz.SPA.151-4.M1.binNME-AIR-WLC25-K9
The issue that we are experimenting is that, although the module's interfaces are up and HSRP in correctly configured, the show standby summary displays that the Active router is local in both routers. We also have some GigabitEthernet in the routers and they are correctly running HSRP. Does the WLC Modules physically support HSRP?

Cisco Switching/Routing :: 3945 Loose Connection Between Router And Switch

Jun 29, 2012

We are having problems with a two router 3945 in HSRP and a switch 2960.The two routers are connected to the switch 2960 through differentes ports. The problem is that we loose connection between the router and the switch.When we excute the command: show cdp neighbor at router, it shows nothing.If we try to make ping to the 2960 switch it is no reachable.If we make ping to the other router 3945 it is not reachable.All other function of the router are o.k.We are attaching the IOS of the routers and switch 2960 and a document in which make reference to a BUG in which mention about arp overwrite due arp attack which produce DoS.

Cisco :: Monitoring Raid Status On SRE-910 Module In 3945 Router

Feb 7, 2013

We just recently purchased a 3945 ISR G2 router and have a SRE-910 module (with two hard drives) configured in a Raid 1. We are running a stand-alone version of ESXi on the service module and I'm trying to figure out how to monitor the status of the Raid on the drives (along with other health issues). SNMP has revealed nothing so far and even opening a support case for which MIB's to use has proved fruitless. All the documents I find on monitoring the modules say to use LMS which is now Cisco Prime. I've downloaded the trial copy, put in the SNMP settings and scanned the router. I get device results and it shows that I have the SRE-910 module installed, but I get no other configuration / device informaiton from the module itself.
I tried to create a new Monitoring template using the NAM health as the base template (which I'm assuming this is the correct template). Unfortunately, when I actually try to deploy the template against the discovered router, I get an 'Unexpected end of list' error which makes me assume I'm still doing something wrong.

Cisco WAN :: Assigned Task Of Configuring 3945 Router For Sip Circuit

Aug 31, 2012

I have been assigned the task of configuring a 3945 router for sip circuit. [code] Where am I supposed to put this config? On the bonded serial link?

Cisco Switching/Routing :: To Reload The Module 3 On The 6509 Switch

Jul 31, 2012

Suffered a big outage on the network, the fix was to reload the module 3 on the 6509 switch, we had these errors on the log %CONST_DIAG-SW1_SP-3-HM_PORT_TEST_FAIL: Switch 1 Module 3 TestUnusedPortLoopback Port(s)[24,46] failed. System operation continues.in the end, we reloaded the card and it was all ok. is there anything I can do to check the card / or any deeper logs? would that error cause the card to crash?

Cisco Switching/Routing :: Switch Module Install For 2951?

CiscoSep 3, 2012

Any doc for installing the a PoE switch module for a 2951? I find alot about the 2951 PoE Power supply but nothing for the switch module.

Cisco Switching/Routing :: Module Power Down On 6513 Switch?

Cisco 3945 Port Numbering

Apr 28, 2012

We have Communication Media Module (WS-SVC-CMM) mounted on 6513 switch. It went down twice and we brought it up by applying 'power enable module'.

Cisco Switching/Routing :: Setting Up Switch Module On 2951?

Sep 18, 2012

I'm trying to set up a 2951 with a 24 port switch module. I want the ports to act similiarly to the ports on an 881 router - where I assign the VLANs on the router and I set the VLANs to the switchport interfaces.I would like to be able to create the VLANs on the router portion of the 2951 and then, enter the switch module and configure the Ports to the VLANs but, how do I logically connect router to the switch? Is it an internal logical interface - meaning how are the VLANs getting from the router to the switch?

Cisco Switching/Routing :: GLC T Sfp Module Showing Unspecified In Switch 2960

Mar 6, 2012

We have supplied Cisco Swtch 2960 with gig SFP modules. It is working fine. However, when I do a show inventory it show proper part no. for the switch chassis but for the GLC T module it shows as unspecified in the PID column.

Cisco Switching/Routing :: Module Ws-x4548-rj45v+ And 4506 Switch

Oct 4, 2012

I have a problem with a newly bought ws-x4548-rj45v+ i've plugged in the module but when i do show modules all , it show as unsupport
Power consumed by backplane : 0 Watts
Mod Ports Card Type Model Serial No.---+-----+--------------------------------------+------------------+-----------1 2 Supervisor IV 1000BaseX (GBIC) WS-X4515 JAE1048GAXQ2 48 10/100/1000BaseT (RJ45) WS-X4448-GB-RJ45 JAB064806WN3 48 10/100/1000BaseT (RJ45) WS-X4448-GB-RJ45 JAB063005DB4 0 Unsupported module WS-X4548-RJ45V+ JAE1545056U
M MAC addresses Hw Fw Sw Status--+--------------------------------+---+------------+----------------+---------1 0007.0e64.f880 to 0007.0e64.f881 5.2 12.2(20r)EW1 12.2(46)SG Ok2 000b.5fa4.da20 to 000b.5fa4.da4f 1.0 Ok3 0009.e844.d760 to 0009.e844.d78f 1.0 Ok4 ccef.4815.9bf0 to ccef.4815.9c1f 2.0 Unsupport

Cisco Switching/Routing :: 4 And 8 Port Switch Module In 1941 Router

May 23, 2013

My questions is can a 4 port PoE switch module (EHWIC-4ESG-P) and a 8 port switch module (EHWIC-D-8ESG) be used at the same time in a Cisco 1941 router?

Cisco Switching/Routing :: 2811 With 16 Port Switch Module Configuration?

May 12, 2013

I have a laptop with a single physical NIC which I have used the advanced management tools to create two virtual NICs (say vlan 10 and vlan 20) and both are on the same subnet (say 192.168.4.x). One NIC is for normal TCP/IP traffic and one is for broadcast/multicast traffic (I have some custom software that requires this to be the case and works fine on an older laptops with built-in physical NIC and PCMCIA XIRCOM NIC). The dual NIC laptop communicates with a dual NIC server via a Cisco 2811 router (which has a 16 port switch module at the back) and has vlans set up so.
What I want is for the single NIC laptop (with two virtual NICs) to be able to also communicate with the server. Basically, one NIC is for normal traffic and one is for multicast/broadcast traffic. All three machines need to be able to talk to each other using the NIC for normal traffic and both laptops must be able to receive broadcasts from the server. What is the best way to configure the router to handle the trunking/tagging? Most configuration documentation I read has two complete subnets for the two virtual NICs. Note that all three machines use static IPs and are part of a workgroup so no DNS and domain servers etc.

Cisco Switching/Routing :: Adding N7KM132XP-12 Module To Nexus 7K Switch

Jul 31, 2012

Trying to find some documentation as to whether there are any other steps for inserting this new module in our N7K. We have 2 blades in already and 2 Sups in 5 & 6. I'm assuming its like the 6500s, where we just slide it in and the OS configures the global parms for it and the default VLAN.

Cisco Switching/Routing :: VSS Switch Got Hang After Inserting 6708 Module?

Jan 11, 2012

We having a VSS switch (9 slot chasis) with ios 's72033_rp-ADVENTERPRISEK9_WAN-M), Version 12.2(33)SXI4', slot 7-9 are currently free. We wanted to install WS-X6708-10G-3C module on slot 7. Once we installed the module it didnt come, after waiting for 15-20min again we removed and inserted, but module didnt come up and we could see following logs on the console:
Jan 12 08:57:40.146: %ISSU-SW2_CFC2-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
*Jan 12 08:57:40.330: %ISSU-SW2_SPSTBY-3-ERP_AGENT_SEND_MSG: client/entity send failed; error code is timeout
Jan 12 08:57:40.146: %ISSU_ERROR-SW2_CFC2-3-START_NEGO_FAILED: ISSU NTI Client(2040): failed to start negotiation (ISSU_RC_CLIENT_ENTITY_DOES_NOT_EXIST_IN_PEER)
[code]....
Afer some time VSS switch didnt response to console commands and all the users in access switches were not able to reach the gateway (VSS). Then the problem disappeared once we rebooted both the switches in VSS.why the VSS switch become non-responsive?

Cisco Switching/Routing :: Switch To C6500E Backbone Without Getting Network Module

Apr 16, 2013

can i use any downlink port of the C4500-X switch as uplink without the need of the network module?i need to connect that switch to C6500E backbone without getting the network module, is that OK or i must get the network module?

Cisco Switching/Routing :: How Switch Module Works In 2911 Router

Sep 4, 2012

how this switch module works in 2911 router? I have two 2911 routers in HSRP configuration for redundancy with crossover cable between switch modules. OSPF running on routers.If active router loses its power and then comes back again, it boots first, its internal link to switch module comes up and it starts to forward packets to switch module. The switch module starts to boot only after router is ready. So I have outage of about 3-4 minutes. For our real-time applications it is way too long.
any way to start booting of the switch module before router gets ready?I understand I can boot it manually, but it is only after router is ready. Only way to get around it I found is to disable internal link and use router interface to connect to the switch module.

Cisco Switching/Routing :: 2960 Switch Hanging With SFP Module Slots

Sep 2, 2012
Numbering

My Cisco 2960 Switch hanging problem (does not work or LED light), when i removed SFP module slots its working fine.

Cisco Switching/Routing :: Configuring Radius On 2950G Switch With IOS 12.1?

Jul 20, 2011

getting radius to work on a 2950G switch with an older IOS of 12.1(22)EA1. I have radius setup on a windows 2k8 box and all of my other switches 2960's and above have no issues. I am unable to input the nas-identifier of 32 into the config using - radius-server 32 attribute 32 include-in-access-req format %h as well as the aaa session-id common commands. Doing a debug radius says that the radius server is not defined.

Cisco Switching/Routing :: 4507 Getting Error While Configuring A Switch

Nov 8, 2011

I have a 4507 cisco switch loaded with two sup-modules.. [code]

Cisco Switching/Routing :: 3925ISR Backing Up IOS And Configurations From Ether-switch Module

Jul 10, 2012

I am trying to research the possiblity of backing up IOS and configurations from an Etherswitch module, and being able to store the files onto the Host Router's flash (3925 ISR). and then being able to recover that IOS and configuration, in case I have to replace the Etherswitch Module.

Cisco Switching/Routing :: 6513 Switch Giving Module 11 In Power Down State

Apr 7, 2012

After a power problem at our data centre we find Module 11 of our Cisco 6513 Core Switch in PWR Down state.Show Module 11 returns: Status: PWRDownShow Power Status Module 11 returns: OperStatus Off (Module Reset due to an exception or user request).The command:
Power enable Module 11 was issued and returned the following: %PM_SCP-SP-1-LCP_FW_ERR: System resetting module 11 to recover from error: Linecard received system exception. Errcode = 2509000001.%OIR-SP-3-PWRCYCLE: Card in module 11 is being powercycled Öff (Module reset due to exception or user request%C6KPWR-SP-4-DISABLED: Power to module in slot 11 set off (Module Reset due to exception or user request),We have restarted the switch twice. The module is currently not passing traffic causing downtime to services.

Cisco Switching/Routing :: Can Put Module On 4507R Switch Running On Live Production

May 2, 2012

Can we put a module on a 4507R switch running on a live production? The module will come from a 4506 switch.

Cisco 3945 Slot Numbering Software

Cisco Switching/Routing :: Configuration Module Supervisor Switch Catalyst 4500

Jun 4, 2012

switch catalyst 4500 with ios cat4500e-universal.SPA.03.02.00.XO.150-2.XO.bin. I need to configure modules 3 and 4 of supervision, the problem is that I need the 4-port module 3 are active but only the first turn on both the module 3 and the first port on the module 4. [code]

Cisco Switching/Routing :: 3925 With 48 Port Switch Module Infinite Loop

Jan 19, 2012

I have a 3925 Router with a 48 port switch module (part number SM-D-ES3G-48-P). I have no problem accessing the 3925 Router, but when I go into the 48 port, I get an error that reads
Error Hardware not supported by firmware. Try loading a newer software instead. System Resetting...
I know that the wrong IOS is installed on the switch, but the problem is that this is an endless loop. The switch resets then comes back to the same error. How to get the switch out of this loop so that I can load the correct IOS.

Cisco 3945 Slot Numbering Machine

Cisco Switching/Routing :: Replacing A Dual Supervisor Module In A 6513 Switch?

Jun 18, 2012

I have a supervisor blade, (VS-S720-10G-3C), in a 6513 that is faulty and needs replaced. Do I need to replace the IOS on the new supervisor blade to make sure it is the same as the IOS image that is on the Active supervisor module, or will it synchronize automatically?
In the synchronization process, the active supervisor engine checks the standby supervisor engine run-time image to make sure that it matches its own run-time image. The active supervisor engine checks three conditions:
#
•If it needs to copy its boot image to the standby supervisor engine
#
•If the standby supervisor engine bootstring needs to be changed
#
•If the standby supervisor engine needs to be reset
I was reading the above documentation that mentioned the active supervisor should copy the image if it detects a newly installed standby supervisor blade with a different image, is this correct or was it referring to synchronizing the configuration file?

Cisco Switching/Routing :: 1941 Port-Security With Router Switch Module

Feb 29, 2012

I have a 1941 that I am going to deploy with a HWIC-D-9ESW switch module (I only need 3 switch ports but need the PoE). I am going to hang a 1262 autonomous AP off one of the ports but I need to configure MAC address port-security so that only that AP can pass traffic. I know the switch modules are 'almost' exactly like a switch for commands but I can't seem to enable or configure any port-security settings. Is port-security no available on the switch modules?

Cisco Switching/Routing :: Layer 3 Module Required For 5500 Series Switch?

May 16, 2013

We are working with a contractor to upgrade our network, and I heard from them that the 5596/5548 might not need the Layer 3 module for our inter-VLAN routhing. They have yet to give me an answer.
We do have a few static routes on our current layer-3, core switch too.